Project Description

Cidon were appointed to carry out the full groundworks and structural elements package on the new Hyatt Hotel scheme at 2 Sovereign Square in Leeds, for repeat client GMI Construction Group.

Located adjacent to the main railway station in Central Leeds, the project comprises a 12-storey high, 305 room hotel on the last remaining plot within the flagship development site.

Double height columns will be cast insitu, ready for the feature ground floor frontages, with recessed detailing around the arch-heads and down the columns, with a glazed frontage behind.

Unique Features

  • Twin Wall System to Cores
  • Double height soffits from ground floor to second floor.
  • BAMTEC reinforcement to slabs.